SECTORAL > OTHERS  
 WASTE WATER SYSTEMS PRE-TREATMENT SYSTEMS REVERSE OSMOSIS
CLIENT/PROJECT
CATAGORY
CITY
DOMESTIC / ABROAD
CAPACITY
(m3/day)
YEAR
GUMBET / BODRUM MUNICIPALITY BIOLOGICAL TREATMENT
 
BODRUM
DOMESTIC
10000
2008
TÜPRAŞ İZMİT RAFİNERİSİ WASTE WATER REUSE SYSTEM
 
KOCAELI
DOMESTIC
9840
2008
GUMUSLUK MUNICIPALITY BIOLOGICAL TREATMENT
 
BODRUM
DOMESTIC
2500
2009
OPF- SAKHALIN PROJECT "1900 PERSON CAPACITY PACKAGE WW TREATMENT SYS. STABILIZATION, BIOLOGICAL TREATMENT, NITRIFICATION
DENITRIFICATION, FILTRATION, SLUDGE DEWATERING"
SAKHALIN ISLAND/ RUSSIA
ABROAD
475
2003
GENERAL COMPANY FOR WATER AND WASTEWATER 1500 PERSON CAPACITY ST27 PACKAGE WW TREATMENT SYSTEM
LIBYA
ABROAD
300
2009
ALMASSA 1000 PERSON CAPACITY 2XST27 PACKAGE WW TREATMENT SYSTEM
LIBYA
ABROAD
300
2009
ASIR AKSU GOVERNMENT HOSPITAL
700 PERSON CAPACITY BT 42 PACKAGE WW TREATMENT SYSTEM
ANTALYA
DOMESTIC
140
2005
BORAS CONCRETE IND
200 PERSON CAPACITY BT 9 TREATMENT PACKAGE SYSTEM
CYPRUS
ABROAD
30
2005
S%T CONSTRUCTIONS 100 PERSON CAPACITY BT 6 PAKET ARITMA SISTEMLERI CYPRUS ABROAD 20 2006 CONSTRACTION CHEMICAL & COSMETIC
BALIKESIR
DOMESTIC
576
2004
BABAESKI OPET GAS STATION 100 PERSON CAPACITY BT 6 PAKET ARITMA SISTEMLERI
LIBYA
TEKIRDAG
20
2006
DAYVAK SERUM FACTORY
100 PERSON CAPACITY BT 6 PACKAGE WW TREATMENT SYSTEM
ANKARA
DOMESTIC
15
2004
UZKA CONSTRUCTION
50 PERSON CAPACITY BATCH BIOLOGICAL TREATMENT SYS
ADAPAZARI
DOMESTIC
10
2003


 

Aquamatch Turkey
Introductory Presentation














Contact
   Designed 3G    
© AQUAMATCH TÜRKİYE